|
10-18-2012
|
|
|
North view of VIA’s South Texas Medical Center Transit Center (STMCTC) campus which
is currently under construction at the corner of Medical Drive and Babcock. The
STMCTC facility is scheduled to open later this year, right in time for the launch
of VIA Primo.
|
|
|
|
|
Main structure canopy structural steel assembly is complete at VIA’s South Texas
Medical Center Transit Center (STMCTC) which is currently under construction at
the corner of Medical Drive and Babcock.
|
|
|
|
|
Driveway entrance paving operations are underway at VIA’s South Texas Medical Center
Transit Center (STMCTC) which is currently under construction at the corner of Medical
Drive and Babcock. The STMCTC facility is scheduled to open later this year, right
in time for the launch of VIA Primo.
|
|
|
|
|
Structural steel beam construction progresses at VIA’s South Texas Medical Center
Transit Center (STMCTC). The STMCTC is scheduled to open later this year, right
before the launch of VIA Primo.
|
|
|
South Texas Medical Center Transit Center, at the corner of Babcock and Medical
Drive, under construction. Scheduled completion of the new transit center is Fall
2012.
|
|
| |
|
|
|
|
Buffer/retaining wall constructed at the South Texas Medical Center Transit Center
site, located at the corner of Babcock and Medical Drive.
|
|
|
|